Case study · MENA
Power tools: a UAE distributor's first year-end consolidation
Who was buying, and what they were buying
Every case starts the same way: a specific buyer, a specific product, a specific number. The generic version of this conversation is where quotes go wrong.
What actually made this order hard
Price was rarely the hard part. These are the four constraints that decide whether an order lands well or lands badly.
- Their freight was paid per factory, so the landed cost of the same order changed every time they reordered, which made it impossible to hold retail prices steady in a market where competitors quote aggressively.
- Three of the six factories shipped by air and three by sea, arriving weeks apart. The warehouse could never present a complete order to the client, so goods sat in our Guangzhou warehouse unpaid for longer, and the client could not plan a single distribution run.
- Workshop equipment is heavy and volumetric. Two of the factories used oversized cartons, so a shipment that weighed 3,200 kg in goods occupied the space of 4,100 kg in freight — they were paying to move air.
- Consumables and capital equipment were being shipped together, which meant the whole order waited for the slowest and heaviest part before anything moved.
Each of these is a silent failure
A buyer does not discover these on delivery day. They discover them when a consignment partner declines to renew, when a customs broker rejects the paperwork, or when a season lands unbalanced. Each of those costs more than the freight we were ever going to quote.
Naming the constraint up front is the part of the job that protects your margin.
What we did about it
Four moves, in the order we made them. Each one is a normal part of buying through an agent — it is just that most quotes do not tell you they are happening.
One freight model, quoted against actual cube
We quoted the consolidation on the real packed cube, not the factory carton cube, and split the order into two freight profiles: heavy capital equipment by sea, and light consumables by air. The client saw one landed number with the split shown inside it.
A single cut-off date across all six factories
We set one dispatch deadline for every factory and confirmed it weekly against the consolidated purchase order. Where a factory was going to be late, we brought that factory's output forward in the receiving sequence rather than pushing the whole order back.
Carton re-engineering handled at our warehouse
Oversized cartons were broken down and repacked to the real dimensions at our warehouse, which is where the cubic saving was actually realised. Repacking was done for the client's account and shown as a separate line in the quote.
Split dispatch, single commercial invoice
Capital equipment and consumables went out as two physical consignments under one commercial invoice and one DDP rate, so the client received a complete order with two delivery windows it could plan around.
What changed, measured
Days saved, money saved, units verified. If a number would not survive a request for the working, it does not go on this page.
Freight per factory meant I could not set a retail price and hold it. Now I get one landed cost, and I can see inside it — sea for the heavy things, air for the small things, one invoice. That is what lets me quote a hardware retailer for a year and still sleep at night.
Run the same arithmetic on your order
Send the product links, quantities and destination. We reply with an itemised quote and a landed-cost breakdown within 2 hours — goods value, sourcing fee, freight, duty and VAT, each on its own line.