Chinese New Year falls on 6 February 2027, with New Year’s Eve on 5 February and holidays running up to nine days across most manufacturing provinces. Factories stop 2–4 weeks before that date, and the real recovery — including the backlog after reopening — runs 4–6 weeks. If your stock has to be on a shelf in Q1 2027, the ordering decision is made in December 2026, not January.
The three cut-offs, worked backwards from 6 February 2027
There is no single “last order date”. There are three layers, and each one moves for a different reason. Missing the first means paying peak prices. Missing the second means waiting for the factories. Missing the third means your goods sit in Guangzhou until the carriers resume.
| Layer | What closes | When it bites | What has to be done before it |
|---|---|---|---|
| 1 · Promotional price | Seller list price and stock held on the platform | Sellers stop holding promotional inventory after the December 2026 season | Item links verified against the compliance boundary; a quote requested and issued within 2 hours |
| 2 · Factory shutdown | Production, custom packaging, final assembly | 2–4 weeks before 6 February; real impact 4–6 weeks including the post-holiday backlog | Orders paid to suppliers in RMB, goods received, inspected and consolidated in Guangzhou |
| 3 · Logistics cut-off | Last acceptance onto a given lane | Compressed ahead of 5–6 February and the nine-day holiday | HS classification done, destination documents prepared, duty and import VAT settled in advance |
Transit times by mode: the numbers to count back from
These are planning anchors, not delivery promises. Every corridor tightens closer to the holiday, so the binding constraint is usually carrier acceptance — not the transit time itself.
| Mode | Reference anchor | What tightens first |
|---|---|---|
| Air DDP | 6–12 days | Capacity closest to the holiday |
| Нехай LCL | From 30 days transit | The weekly consolidation cut-off |
| Експрес | Carrier window, corridor-specific | Pickup and line-haul staffing |
| Rail | Corridor window, case by case | Documents must be complete before the cut-off |
All four are confirmed at the time of booking, per carrier and per corridor. We publish cut-offs rather than delivery dates because that is the only figure that stays true across lanes.
Why DDP changes the January problem
Under DDP, duty, import VAT and customs clearance are settled before dispatch — there is nothing payable when the parcel arrives, and we act as the importer of record. During the holiday that matters more than in normal months: reduced customs staffing and slower certificate checks hit consignees who still have to clear their own goods, and those delays land after the factories have already reopened.
The quote is built as one all-in landed cost in USD across four lines: product value, the tiered sourcing fee, China inland freight, and international DDP freight. The fee ladder is six tiers from 6% to 2%, with a minimum of US$30 per order — and there is no minimum order quantity, so a single item is accepted.
The full CNY 2027 guide series
This series is published in five languages:
- French — what ships before the shutdown · last safe order date by mode · DDP ou DAP · coût rendu B2B
- Spanish — qué sale antes del cierre · última fecha segura por modo · DDP frente a DAP · coste en destino B2B
- Ukrainian — що встигає до Нового року · терміни й cut-off · DDP чи DAP · вартість DDP для малого B2B
- Arabic — ما يُقبل قبل رأس السنة · جداول القطع ومدد الشحن · DDP مقابل DAP · تكلفة DDP للمشترين الصغار
Frequently asked
6 February 2027. New Year’s Eve is 5 February, and most factories and freight forwarders work reduced hours for the week before and up to nine days after.
There is no single date — there are three. Promotional pricing closes with the December 2026 season, factories wind down 2–4 weeks before 6 February, and logistics acceptance compresses just before the holiday. Counting back from your target shelf date is the only reliable method.
Production typically stops 2–4 weeks before the holiday. The practical disruption is 4–6 weeks once the post-holiday backlog is included, because suppliers restart with a queue.
Yes, if the goods are already in our Guangzhou warehouse. Once received, inspected and consolidated, air DDP typically runs 6–12 days. The constraint after the shutdown is stock, not the lane.
The mechanism is the same all year: one all-in landed cost in USD covering product value, the tiered 6% to 2% sourcing fee (US$30 minimum), China inland freight, and international DDP freight with duty and import VAT settled before dispatch. What changes in the holiday window is capacity and timing, not the fee structure.
They stay in our Guangzhou warehouse. Storage is free for 90 days after arrival, so a missed lane becomes a scheduling problem rather than a cost problem — you wait for the corridor to reopen instead of paying for storage.
We check the item against the compliance boundary, confirm which lane still accepts it, and quote one landed cost in USD — duty and import VAT included. No minimum order quantity.